Setting up or expanding a plant in Supa MIDC starts with a shed that is built right the first time. We coordinate turnkey pre-engineered building (PEB) sheds and civil works for factories across Supa Phase 1, Phase 2 and the Japanese Industrial Park.
Our scope covers design coordination, structural drawings, foundations, steel erection, roofing and cladding, flooring and finishing, so a single desk is accountable from the first survey to handover.
What we offer
- Turnkey PEB sheds, warehouses and factory buildings
- Trimix / VDF industrial flooring for heavy machinery
- RCC frames, columns, footings and machine foundations
- Compound / boundary walls, security cabins and gates
- Internal roads, drainage and storm-water lines
- Plant expansions, mezzanines and shed extensions
- Structural drawings and stability certificates coordination
- Roof sheeting, ventilation, skylights and turbo vents
Key details
| Clear height | 7 m to 12 m (as per process need) |
|---|---|
| Floor load | 5 to 15 MT/m² Trimix / VDF |
| Structural steel | High-tensile 345/350 MPa grade |
| Typical timeline | 60 to 75 days for ~15,000 sq ft after foundations |
How it works
- Site visit and requirement study
- Layout, drawings and BOQ estimate
- Foundation and civil works
- Steel fabrication and erection
- Roofing, cladding and flooring
- Handover with documentation
Guides on Civil / PEB Construction
- How to Choose a PEB Contractor: 10 Questions to Ask
- Industrial Power Connection: Planning Load for a New Factory
- Monsoon Preparedness for Factories and Sheds
- Trimix / VDF Industrial Flooring Explained
- PEB Shed Construction in Supa MIDC: Cost Factors & Timeline
Frequently asked questions
How long does a 15,000 sq ft PEB shed take?
Typically 60 to 75 days after foundation work is complete, depending on design, steel availability and weather.
Do you provide structural drawings for MIDC plan approval?
Yes. We coordinate structural drawings and work with the architect so the plans can be submitted for MIDC building plan approval and later BCC.
Can you extend an existing shed?
Yes. Expansions, side extensions, mezzanine floors and crane-ready bays are common requests.
Is PEB cheaper than a conventional RCC building?
For large spans and industrial use, PEB is usually faster to build and more economical than conventional construction. We give a BOQ so you can compare.
Industries that use this service
Automotive & Auto Components • Engineering & Fabrication • Foreign & Japanese Investors • Air Conditioners & Consumer Durables • Sugar, Ethanol & Allied Units • Wind & Solar Energy • Pharma & Chemicals
Civil / PEB Construction near you
We provide Civil / PEB Construction across the Supa–Parner corridor. Pick your area for local details:
- PEB Shed & Civil Construction Contractor in Supa MIDC Phase 1
- PEB Shed & Civil Construction Contractor in Supa MIDC Phase 2
- PEB Shed & Civil Construction Contractor in Japanese Industrial Park, Supa
- PEB Shed & Civil Construction Contractor in Ahilyanagar (Ahmednagar)
- PEB Shed & Civil Construction Contractor in Pune
Also serving: Supa • Parner • Shirur • Ranjangaon MIDC • Kedgaon • Nighoj & Parner Villages • Shikrapur • Ahilyanagar MIDC (Nagapur).