Industrial Power Connection: Planning Load for a New Factory

How to estimate connected load, LT vs HT supply and what to plan before applying to the electricity distributor.

Updated 26 November 2026 • SupaMIDC.in Desk

Power is often the longest-lead item in a new factory. Plan it alongside your shed design, not after.

Estimate your load

  • List every machine with its rated kW / HP
  • Add compressors, lighting, HVAC and office load
  • Apply a realistic diversity factor and keep room for expansion

LT or HT?

Smaller loads are supplied at low tension (LT). Larger loads are supplied at high tension (HT), which needs your own transformer and substation space. Your distributor's current rules decide the cut-off.

Plan in the layout

  • Transformer yard and HT panel room near the road
  • Cable trenches along machine lines
  • Space for DG set and fuel storage
  • Power-factor correction (capacitor panels)

When leasing a shed, check the sanctioned load first – enhancing it can take time.