Trimix, also called vacuum dewatered flooring (VDF), is a method of laying concrete floors where excess water is removed with a vacuum pump right after placing. The result is a denser, stronger and more wear-resistant surface than ordinary concrete.
Process
- Sub-grade preparation and compaction
- Concrete laid in panels
- Vibration with screed vibrator
- Vacuum dewatering
- Power floating and troweling
- Joint cutting and curing
What to specify
- Design floor load (point loads of racks and machines)
- Slab thickness and reinforcement
- Surface hardener if heavy wear is expected
- Joint layout to avoid random cracking
Plan machine foundations separately for heavy presses and vibration-producing machines. Discuss your layout with our construction desk.