In short: What to compare when getting quotes for a pre-engineered steel shed so you are not surprised later.
- Who designs the structure? Ask for design by a qualified structural engineer, with drawings and calculations.
- What steel and coating? Confirm the steel grade, primer and paint system, and the roof sheet thickness and coating.
- What is included? Foundations, anchor bolts, sheeting, gutters, downpipes, skylights, ridge vents, insulation, doors.
- Is it crane-ready? If you need an EOT crane now or later, the design must include it.
- Who does the civil work? Same contractor or separate? Who is responsible for the levels matching?
- What flooring? Ask for Trimix / VDF thickness and reinforcement suited to your loads.
- Timeline? Get dates for design, fabrication, delivery and erection.
- Payment milestones? Tie payments to visible progress.
- Warranty? Ask what is covered for leaks and coating, and for how long.
- References? Visit at least one completed shed.
Read our PEB cost guide and Trimix flooring guide, or ask our construction desk for a BOQ.
General information for the Supa MIDC / Ahilyanagar area. Rules, fees and timelines change, so confirm on the official portal before acting.