Every industrial unit in Maharashtra that may cause air or water pollution needs consent from the Maharashtra Pollution Control Board (MPCB). There are two stages.
Consent to Establish (CTE)
CTE is required before you start construction or install machinery. It confirms that the location, process and proposed pollution controls are acceptable.
Consent to Operate (CTO)
CTO is required before you start production. The board checks that what was promised at the CTE stage has actually been installed. CTO is valid for a fixed period and must be renewed.
Industry categories
Industries are grouped into categories (commonly Red, Orange, Green and White) according to pollution potential. The category decides the documentation, fees and validity.
Documents commonly requested
- MIDC allotment letter or lease deed
- Site layout and building plan
- Manufacturing process description and flow chart
- Product list with capacity
- Raw material list and quantities
- Water balance and wastewater treatment details
- Air pollution control equipment details
- Hazardous waste details, if any
- Capital investment proof (CA certificate)
Common reasons for delay
- Mismatch between process description and products
- Incomplete water balance
- Wrong category selection
- Capital investment figures not supported by a CA certificate
Get MIDC Approvals in your area
MIDC, MPCB & Factory Licence Consultant in Supa MIDC Phase 1 • MIDC, MPCB & Factory Licence Consultant in Supa MIDC Phase 2 • MIDC, MPCB & Factory Licence Consultant in Japanese Industrial Park, Supa • MIDC, MPCB & Factory Licence Consultant in Ahilyanagar (Ahmednagar) • MIDC, MPCB & Factory Licence Consultant in Pune • MIDC, MPCB & Factory Licence Consultant in Ahilyanagar MIDC (Nagapur)
General information for the Supa MIDC / Ahilyanagar area. Rules, fees and timelines change, so confirm on the official portal before acting.