Crane Lifting Safety: A Site Checklist

Checks to do before, during and after a crane lift at a factory or construction site.

Updated 27 November 2026 • SupaMIDC.in Desk

In short: Checks to do before, during and after a crane lift at a factory or construction site.

Before the lift

  • Know the load weight, including slings and attachments
  • Confirm the crane's capacity at the actual radius and boom length
  • Ground is firm and level; outriggers on proper pads
  • No overhead power lines in the swing area
  • Slings, shackles and hooks inspected and suitable
  • One trained signal person agreed

During the lift

  • Area barricaded; no one under the load
  • Tag lines to control swing
  • Slow, smooth movements; stop if wind is strong

After the lift

  • Load set down on stable supports before slings are removed
  • Any near-miss recorded

Hire operated cranes through our crane desk. Read also: choosing crane capacity and factory safety basics.