Fire NOC for Factories in Maharashtra: Provisional vs Final

When an industrial unit needs a fire NOC, what the two stages mean and how to prepare for inspection.

Updated 20 October 2026 β€’ SupaMIDC.in Desk

Fire safety approval is a key part of factory setup. In MIDC areas, it is usually handled by the MIDC fire services.

Provisional fire NOC

Obtained at the planning stage, based on building plans showing fire exits, hydrant lines, extinguishers, fire water storage and access for fire tenders.

Final fire NOC

Issued after inspection of the completed building, once fire-fighting systems are installed and tested as per the approved plan.

Preparing for inspection

  • Extinguishers of the right type and number, with valid refills
  • Hydrant and sprinkler systems tested
  • Clear, signed exit routes with emergency lighting
  • Fire water tank and pump room as per plan
  • Trained fire wardens and mock-drill records

Our approvals desk coordinates fire NOC along with MIDC and MPCB approvals.